Aug 24 – Aug 28, 2026

Weekly Production Schedule

Monday

August 24, 2026

48" Mono
Mono-1

Storm MH-5 FT

Job: LURA Sidewalk and Lighting Improv - Laurel

Mono-2

Storm MH-8 FT

Job: LURA Sidewalk and Lighting Improv - Laurel

Mono-3

Storm MH-10

Job: LURA Sidewalk and Lighting Improv - Laurel

Invert Channel-1

14-MH #61 EXT.

Job: Poplar Phase 2

Invert Channel-2

13-MH #62 EXT.

Job: Poplar Phase 2

Invert Channel-3

15-MH #56 EXT.

Job: Poplar Phase 2

48" Components
48" BarrelPRIORITY

16" Reg Stock

64" Barrel - Old

48" WQU - NO STEPS

64" Barrel - New

48" REG - STOCK

Eccentric Cone

3' Eccentric Cone (STACK THESE)

Job: STACK THE CONES

Flat-Top Lid-1

12" - 24" OFFSET

Flat-Top Lid-2

6" - 24" OFFSET

60" Components
60 Mono

Air Vac Mono

Job: W.O. 22-44 Zone 1 Water Storage

60 Flat-Top LidPRIORITY

Olympic Park 13" w/ 42x42 Hatch 2 of 2

Spacer Rings
24" RingsPRIORITY

25 @ 2" - 2 @ 4"

Tanks
2200 Cistern

C2200 - CISTERN

1500 2-Piece [Dual Chamber]

TST15D - SEPTIC

500 Single Piece

DT05S - DOSING

Special Build
Special-1

SDCI-1 (ALT3)

Job: AC Marriot - 30X30 Inlet

Thrust Block-1

24 x 24 x 18 Thrust Block

24 x 24 x 18 Thrust Block - Side Pick.pdf
Thrust Block-2

24 x 24 x 18 Thrust Block

24 x 24 x 18 Thrust Block - Side Pick.pdf
Fire Hydrant Pads

___

48" MH Footing Sill 18"x64"x6" ThickPRIORITY

x2 - Footing Sill

Misc / Floor Items
D-Box-Reg

x2

Cone Lock Block-1

___

Cone Lock Block-2

___

Parking Bumpers

___

24" x 36" Spacer Ring

x4