Beta V9.0
Logo
Welcome BackGood Evening 👋
6:59:16 PMTuesday, September 1, 2026

Weekly Schedule

Manhole Projects

Drawings

Raw Materials

Pouring Totals

Plant Layout

Components

Building Progress

Tech Talk

Teamup
Teamup
myTIKR
myTIKR
Coming Soon
Fleetr
Fleetr
Coming Soon
Longship
Longship
Coming Soon
BBEX
BBEX
NEW
Agenda
Agenda
NEW
Today's Weather — Billings
☀️

Partly Sunny

82°
Daytime High
/
59°
Overnight Low
Billings, MT · NWS · F°
Daily Laughs

"What do you call a fake noodle?"

😄

An impasta.

"Why did the bicycle fall over?"

😄

Because it was two-tired.

Jokes #9 & #10 of 59 — refreshes daily
Bulletin Board

The last 3 tech talk notifications have been addressed. See Steve for details.

Jul 21

"Switch" mode is now "Swap"

Jun 15

Now any project that reaches 100% completion will automatically be set to "Complete" status whenever the page loads.

Jun 12

Projects with no scheduled items now show "—" for status and "N/A" for completion.

Jun 12

SHOP AND SUBMITTALS NOW AVAILABLE ON CPP MOBILE

Jun 12

Note the new "Tech Talk" with notification indicator for suggestions, bugs, etc.

Jun 2

The Undo button now handles moves, switches, copy-pastes, and pushes in addition to the existing delete/update/multi-del

Jun 2

You can now "Switch" structures within the category not just the same sub-item.

Jun 2

***PLEASE NOTE*** monday.com as we know it will be gone on August 13th. Please have everything moved.

Jun 2

Today's Holidays
Loading...
September 1 · Powered by AI
Daily Schedule
Tuesday — Sep 1
48" Mono

25-MH #112A EXT.

Poplar Phase 2 · 25-MH #112A EXT.

59-32

Lockwood Sewer_Round3 · 59-32

26-MH #215A EXT.

Poplar Phase 2 · 26-MH #215A EXT.

Invert Channel-1

Poplar Phase 2 · 28-MH #184A EXT.

48" Components
!

48" Barrel

16" Reg Stock

64" Barrel - Old

48" REG - STOCK

64" Barrel - New

48" REG - STOCK

Eccentric Cone

STACK THE CONES · 3' Eccentric Cone (STACK THESE)

Flat-Top Lid-1

12" - 24" CENTERED

Flat-Top Lid-2

6" - 24" OFFSET

Catch Basins

24" Barrel

CB246 - 6" Tall - STOCK

Inlet - 5

Billings Precast Factory #2 · Inlet - 5 - 2@11-06

Tanks

BIG BLUE

SET · C-3660 CISTERN TOP

2200 Cistern

C2200 - CISTERN

1500 2-Piece [Dual Chamber]

TST15D - SEPTIC

1000 Dual Chamber

TST10D - SEPTIC

500 Single Piece

DT05S - DOSING

Special Build

Lynda Lane Inlet-1

Maverik Hardin (Utilities) · Lynda Lane Inlet-1

Special-2

CGB96-11x7 - Cattleguard Base

Lynda Lane Inlet-2

Maverik Hardin (Utilities) · Lynda Lane Inlet-2

Thrust Block-1

24 x 24 x 18 Thrust Block

Thrust Block-2

24 x 24 x 18 Thrust Block

48" MH Footing Sill 18"x64"x6" Thick

x2 - Footing Sill

Misc / Floor Items

D-Box-Reg

x2

Cone Lock Block-1

___

Cone Lock Block-2

___

Parking Bumpers

___

24" x 36" Spacer Ring

x4

28 assignments6 categories